This is a 4-WAY POWER BOARD WITH 3M LONG-LEAD of brand Jackson.

SALIN is a leading Australian appliance spare parts distributer . We take pride in our ability to bring hard to find appliance spare parts into the Australian market. We are proudly Australian owned and operated. Our warehouse and sales office is conveniently located in Auburn, NSW. Our range of spare parts are manufactured with premium components and quality material. Most of our range is directly sourced from manufacturers and geniune.  

TECHNICAL SHEET
Title 4-WAY POWER BOARD WITH 3M LONG-LEAD
Notes SURGE PROTECTED - SWITCHED 10A Circuit Breaker Surge protection Master Power Switch Right-Angle Plug Extra-long 3 metre cord
ColourWhite
Length3M
PlugR/Angle
SwitchSingle
Outlet4
Voltage240Vac
Cord3.0M
Type4 Way
ManufacturerJackson
FuseResettable 10A
FilterSurge
SKU NoWES_PT4113_1

 

SALIN is not responsible for any possible damage caused by misselection and incorrect installation of the spare parts.

All electrical items must be fitted by a qualified electrician.

Errors and Omissions Excepted:

All information contained herein this website is assumed to be accurate, however, no responsibility is assumed by SALIN  for its use, nor for any infringements of patents or other rights of third parties which may result from its use.

Legal Disclaimer:

All trademarks, logos and principal representations remain the property of their respective owners. The use of brands, brand names and trademarks doesn't imply SALIN is representing those brands, companies, trademarks or names. SALIN holds no rights to products and/or services available or provided by the said companies, brands, brand names and trademarks.

AIRLINK
SKU WES_PT4113_1
Brand Jackson
Shipping Weight 1.0000kg